top of page

Building Technology I

Project 1 : Industrialized Building System

This is a group assignment predominantly relates to the topics of Industrialised Building Systme (IBS).  Before embarking on this project, student will be exposed to different types and methods of the IBS system and the calculation of IBS scoring in the classroom.  First, thew group has to design a 3-storey apartment block using mainly IBS components.  Then, the group has to construct a physical model of the building to imitate the actuial IBS construction process and produce a A3 report with a sectional model

Project 2 : Industrialized Building System

This assignment is aligned with the Studio Design Project (semester 4 and 5) and aims to facilitate students in the technical studies and development of their design. It deals with the analysis and establishment of the structural and the envelope systems of the student’s design to ensure that the design has logical and workable construction systems. It also encourages students to think about construction as integral part of the design and not just an afterthought. Most of the times amateur designers tend to design their spaces without thinking about the construction aspects and later on have to change and redesign their schemes due to the designs were unbuildable. This assignment was designed with the intention to tackle this issue and to increase the technical competency of students

© 2016 By Rudy Irawan. Proudly created with Wix.com
  • Facebook - Black Circle
  • Twitter - Black Circle
  • Instagram - Black Circle
bottom of page